• +91 76980 07216

    Get in touch with us

  • info@saiapplied.com

    Send us an e-mail

  • Home
  • The Company
    • Company Profile
    • From the MD's Desk
    • Certificates
    • Clientele
  • Projects
    • Allied
    • Allied (Chemical)
    • Allied (Power)
    • Oil and Gas
    • Pharma
    • Power
    • Water
    • Waste Water
  • Services
    • System Design
    • Procurement / Manufacturing
    • Site Installation
    • Commissioning
    • Training
  • Career
  • Inquiry
  • Contact Us

Allied

  • Home
  • Projects
  • Allied

Chiller Water System

  • Client : DGNP
  • Consultant : Royal Haskoning DHV
  • Contractor : HCC / Jyoti Ltd.
  • Project Details : Design, Engineering, Supply, Installation, testing and commissioning of LT panel for Chiller room for chiller pump sets.

Jebel Ali Ldesalination Plant Condenser Tube Cleaning System

  • Client : Dubai Electricity & Water Authority
  • Contractor : Gea Energy System (I) Ltd.
  • Project Details : Supply of 10 Nos. PLC based SS Control Panel with Hot Standby PLC System for controlling high pressure water Pumps used for condenser tube cleaning.
Porto Website Template

© 2016 Sai Applied Technologies Pvt. Ltd.. All rights reserved.

Powered by Vasto Communication